How Long Does a Whole House Remodel Take in Las Vegas?

 

Whole House Remodeling

Remodeling your entire house is on your to-do list, but you’re unsure how long it will take. In order to make it easier for you to estimate the time required for the entire process of remodeling your home, we have compiled some general information which we provide below.

A project’s schedule can never be predicted with any degree of certainty in the high-end construction industry. The exact length of time required for a whole home remodel and renovation depends on several key issues.

Because improving a home can cover a wide range of topics, renovations can range from a few improvements to a complete overhaul of a large home. Remodeling can include everything from a few bathroom additions to kitchen and living room remodels. This results in a wide range of prices, depending on your home’s dimensions and the scope and detail of your remodeling project.

The following four stages can give you a rough idea of how long your project will take:

Discovery

A discovery phase involves consulting with designers and contractors, as well as building companies like We Build It. Here you will determine what is viable and how much you should spend.

To determine which company is suitable for your whole home remodel, you’ll consult designers, contractors, and building firms. Consult them about design options and fees.

It can take up to two months for this stage to complete. The length of time it takes for you to find the right person for your project completely depends on the number of people you interview.

Prospective customers should always interview several firms. Designs differ from firms, so having a variety of ideas is helpful.

Design

Once you choose a remodeling company, you will begin the design phase. Large projects take longer to plan and draw.

Project size, surveys, engineering time, and design revisions all affect the length of this stage. Remodels take longer the larger they are. 1.5-3 months are typical for this stage.

Pre-build

It is now our project manager’s turn. He’ll:

Ensure your plans are finalized

Get your materials

Schedule your work to start

Make sure we are all in agreement before construction begins

During this phase, you will also need to secure HOA approvals and apply for the correct city permits, inspections, and approvals (which can take about a month) as well as time to source the necessary materials. This can take around 2 to 2.5 months.

 

Construction 

Schedules and work crews are also locked in during this phase. The majority of the work will be done here. It takes 4 to 6 months for a small whole-house remodel, but up to a year for a large one.

In summary, there are countless factors that affect renovation duration. This makes answering the question, “how long does it take to remodel an entire house” virtually impossible.

When you choose a reputable construction firm, you can always expect your unique renovation project to be completed quickly.

Considering a home renovation project in Las Vegas, NV ? Get in touch with We Build It today.